were used to the building of the cooling system of the new Volkswagen plant in Września (Poland).
The building site covers an area of 220 hectares, which is equivalent to a size of over 300 football fields.
The new plant in Września will be the second production location of Volkswagen Commercial Vehicles in Poland; A modern paint shop will be built on the plant site as well as halls for body assembly and a supplier park with logistics areas.
It’s expected that the first vehicles of the next model of the VW Craft will leave the assembly line and will be delivered starting in the second half of 2016.